CFB Trenton / Strong Bros. · 2025

Airfield Modification Phase 1 — CFB Trenton

Client: Strong Bros. / Department of National DefenceCompleted November 2025
Overview

IPAC Paving supported the Airfield Modification Phase 1 project at CFB Trenton, including asphalt rehabilitation and paving work associated with Runway 06-24 and Taxiway Papa areas. The scope included partial-depth and full-depth milling, full-depth asphalt and asphalt/concrete composite removals, concrete replacement, crack repairs, hot-mix asphalt levelling, binder course placement, surface course placement, and electrical trench repairs. IPAC also supported the project through asphalt production using its mobile asphalt plant capabilities, helping meet the volume and schedule requirements of a major airfield rehabilitation program. The work required strict coordination with the general contractor, base authorities, Department of National Defence security requirements, controlled site access, airfield movement rules, traffic and access coordination, and extended or weekend shifts as required.

Scope of Work
  • Airfield asphalt rehabilitation and paving support
  • Partial-depth and full-depth milling
  • Full-depth asphalt removals
  • Full-depth asphalt/concrete composite removals
  • Concrete replacement and localized repairs
  • Hot-mix asphalt levelling, binder, and surface course placement
  • Crack repairs and electrical trench repairs
  • Asphalt production support using IPAC mobile asphalt plant capability
  • Traffic, access, security, and airfield movement coordination
  • Coordination with general contractor, base authorities, and defence project requirements
  • Extended shift and weekend work coordination where required

Outcome

Demonstrates IPAC's ability to perform large-scale, high-specification paving work in a secure, controlled, and schedule-sensitive airfield environment.